Javascript Menu by Deluxe-Menu.com
Request for Quotation Form

Name   (Required)
Title  
Company Name   (Required)
Address   (Required)
City   (Required)
State  

(Required)

Zip/Postal Code   (Required)
Country   (Required)
Phone Number   (Required)
Fax Number  
E Mail     (Required)
 
1. PROCESS
   
2. MATERIAL HEATED
Size  
Weight  
Thickest cross section  
Condition of pieces     If other is chosen explain below under comments
   
3. FLAMMABLE SOLVENTS OR VAPORS INVOLVED IN PROCESS  
Type  
Amount  
  gallons per batch(or per hour for continuous processing)
   
4. INERT ATMOSPHERE (if required)   If other is chosen explain below under comments
   
5. TEMPERATURE  
Operating Temperature  
Maximum Temperature  
Required dwell time at  
operating temperature  
  (Include time for parts to heat up;
assume preheated equipment)
This Information must be supplied
for continuous processing such as
belt and conveyor or rotary hearth.
Required uniformity  
within workspace  
   
6. MATERIAL HANDLING
Batch     If other is chosen explain below under comments
Quantity of parts  
per batch or production rate  
Continuous     If other is chosen explain below under comments
Length Load Zone       Length Unload Zone  
Pass Line       Production Rate  
Length Cooling Zone       Exit Temperature from Cooling Zone  
     
7. CLEAN ROOM/PHARMACEUTICAL
backwelded seams    front welded ground seams 1/2" radius interior corners
#4 brushed stainless steel exterior door at both ends for pass through
door locks/interlock HEPA fresh air inlet
HEPA exhaust filter HEPA recirculation filter
alarms for filters/temperature pressurizing blower
automation depyrogenation cycle motorized intake and exhaust dampers
one pass granulation drying
   
8. DESIGN  
Type of equipment  
Similar to standard model  
Work space size   wide   x   deep   x   high
Air Flow     If other is chosen explain below under comments
Special Features  
   
9. SPECIFICATIONS APPLICABLE     Military Specification #  
   
10. SERVICES
Electrical Service   Volts   Phase   Hz
To be heated by     If other is chosen explain below under comments
   
11. EQUIPMENT TO BE INCLUDED IN BASE PRICE
 
   
12. EQUIPMENT TO BE INCLUDED AS OPTIONS
 
   
13. BUILDING DATA
Smallest opening through  
which unit must pass  
wide x high
  Don't forget doorways, elevators & existing machinery, pipes, or ducts.
Floor space limitations   wide x deep
Headroom limitations  
Floor or elevator load limitations  
   
14. ADDITIONAL COMMENTS OR EXPLANATIONS
 

Please enter a number between 10 and 99 (Required)