![]() |
|
| Testing••• Grieve’s Assurance of Quality Performance |
The testing of a Grieve oven or furnace is done with the same care and
attention to detail as the design and manufacturing stages. Without exhaustive testing, we would, in effect, be asking our customers to do the testing for us. That’s not the way we do things at Grieve. No Grieve product gets its nameplate until it passes our rigorous test procedure. Our family name is on the door...anything less than the best won’t do. |
| Grieve's Test Department
is always filled with various units being evaluated for performance in a number of different ways. Chart recorders here monitor temperatures throughout the entire oven chamber. Problems are uncovered in our plant, not yours. |
| This unusual cabinet oven is itself a test unit, used by Grieve's customer to evaluate air flow inside and around ductwork. Here the temperature patterns inside and around the test load are measured and monitored. |
| At Grieve, even when a unit must be shipped disassembled, we assemble and fully test it. Any inconsistency in air distribution or temperature uniformity must be discovered before it leaves our factory. | |
| The conveyorized continuous processing oven shown here has multiple heating
and cool-down zones. Parts supplied by our customer are test run at actual operating conditions to simulate shop floor use. Because of such thorough testing, our confidence in Grieve quality soon becomes yours. |